Study Extra: Construction Charge Estimates According to the believed Charge, either a bidding system is done or the venture to handover to some identified contractor. The contractor plus the proprietor have to comply with contract based on which the challenge is carried out.the pre-current building is demolished fully (aside from the retained facad